Monday, 25 March 2024
quote [ Only a few days after it opened, the railway was put out of action by a severe storm. It reopened in July 1897 and ran without major incident until damage to the trackbed meant it couldn’t operate during the summer of 1900, causing a serious loss of business to Magnus Volk. Then in 1901, Brighton Corporation exercised its right to remove some of the track to enable sea defences to be built, and the project came to an end. ]
Crawling through the waves – found via Fallen London newsletter (← link to actual subscription).
|